INTRODUCTION
In an area with poor soils, pre-loading is used as an engineering method to prevent settlement and distress on the final structure by building a temporary wall, adding a load and allowing settlement to take place. Â Pre-loading allows for staged construction of bridges and buildings. Our systems can also be used for pressure relief applications to eliminate lateral loads against below-grade structures. We provide a faster, more affordable alternative to large cast-in-place foundations that support soil and building loads for below-grade construction.
PRE-LOAD PRODUCTS
Envirolok is a patented vegetated environmental system comprised of encapsulated soil bags and spikes combined with the engineered strength of soil reinforcing materials. Envirolok provides a permanent vegetated wall or slope for stabilization, erosion control, shoreline protection...
The Sierra Slope Retention System is a fully integrated mechanically stabilized earth (MSE) solution that incorporates natural vegetation, maximizing the use of valuable land and enhancing property values with naturally vegetated, graffiti-resistant facing options such as plantable sod...
The SierraScape Wire-Formed Retaining Wall System is a cost-effective alternative to conventional retaining wall systems, and is the only wire-formed retaining wall system with a positive connection between the wire form and geogrid reinforcement...
MSE WALLS (ECOTech walls)
SOUTH FRASER PERIMETER ROAD (SFPR)
South Fraser Perimeter Road in Metro Vancouver, also called Highway 17, is a new four-lane highway along the Fraser River, connecting southwest Delta to North Surrey. Nilex assisted in the design and onsite installation of sections of this 40 km-long road and supplied multiple products for its…