fbpx

HUSKY SUNRISE CENTRAL PLANT LINER INSTALLATION

The Sunrise oil sands operations, located 60 kilometers northeast of Fort McMurray, Alberta, is owned by Husky Energy Inc. and BP, and is designed to produce 60,000 barrels of bitumen per day. The site consists of two plants, each containing five tank farms with liner already under the tanks…

HYDROCHLORIC ACID LOOSE-FIT LININGS

The customer, Harber Coatings, specializes in protecting industrial parts against corrosion and abrasion. Their coating process involves the use of dip tanks that contain a solution of nickel, phosphorus, or hydrochloric acid. During a recent inspection, the tanks themselves showed signs of…

SALINE POND MULTI-LAYER LINER SYSTEM

Extensive gas operations near the North Saskatchewan River in Fort Saskatchewan, Alberta, are understandably closely regulated. To help the client remain well above compliance requirements and expand their leak detection capabilities, Nilex implemented the consultant’s designs and worked…