Subscribe

Sign up for our newsletter

                          

Erosion & Sediment Control

Introduction

Erosion & Sediment Control solutions keep soil and seed on construction sites where it is needed and out of storm sewers, nature’s drainages and waterways. Nilex’s site armoring systems are effective temporary and permanent erosion control solutions that provide scour protection and/or energy dissipation in conveyance and slope applications. These solutions often replace rock, saving money and further protecting the environment.

Erosion & Sediment Control Applications

Conveyance / Ditch Structures

Conveyance/Ditch Structures require sediment control, erosion control and armoring solutions. Dependable conveyance lining systems, both hard armor and reinforced green armor, utilize geosynthetics to increase structure longevity and lessen the project environmental impact as compared to...

Roadways

Roadway construction often requires temporary or permanent erosion ditch and/or slope armoring. The importance of erosion control in roadway construction is to keep the bare soils of ditches and slopes in place until vegetation is established. Higher velocity roadside ditches can be effectively...

Slopes

Slopes can present serious vegetation, erosion and sediment control challenges. In addition to the effects of runoff and the need to protect wildlife, many projects face issues surrounding aesthetics. Nilex provides temporary and permanent solutions for your project needs...

Reclamation

Reclamation is the process in which disturbed land is returned to a pre-disturbance natural landscape or other pre-determined end use. Challenges experienced with reclamation projects often revolve around vegetation establishment and rehabilitation of watercourses and soil conditions...

Janvier Ditch Erosion Control

The community of Janvier is part of the MD of Wood Buffalo and is located approximately 100 km south of Fort McMurray...

Read More

Innovation Calculator

Using the Innovation Calculator, we can calculate the economic and environmental benefits when using geosynthetic materials versus conventional methods. This includes total CO2 Emissions, percentage CO2 Savings and project cost savings.

Read More
Innovation Calculator

Testimonials

I want to thank you for getting things organized as quickly as you did for us and for the follow up calls and site visits that allowed us to get this work done and meet our schedule dates for the road work. As well, your product knowledge and ability to provide the technical support when dealing with the consultants was a major help in getting the system approved and installed correctly.

Bob T, Project Manager, MGP Construction Ltd.

Not only was there a substantial cost savings realized by the client, there was also a benefit to the road structure as well. The original design road structure number was 3.780 and a calculated traffic (ESALs) of 2,147,000. The revised road structure number using the TX5 is 4.260 and a calculated traffic (ESALs) of 4,593,000.

Jim B, C.E.T., Senior Project Manager, WSP Canada Inc.

Nilex was an invaluable asset in the successful completion of the Troutbrooke Drive Slope Stabilization project in Toronto, by providing engineering assistance, installation training and continuous on and off site technical support.

Terraprobe Engineering

The CULTEC system was simple to install. We will be recommending, and looking forward to using the Cultec system for future projects.

Kang Construction

We love you guys for getting this project [Energy Environmental Experiential Learning (EEEL) Building Grounds] completed in the timelines required.

S. Chan, EllisDon

The Erosion & Sediment Control Specialist

Ian Corne, CPESC, M.Land.Arch., B.E.S.

Erosion & Sediment Control Specialist

For the past eight years, Ian has specialized in industry design and construction practices in Erosion & Sediment Control. His role is to work with the engineering community and owners to assist in providing site armoring and vegetation establishment solutions. Ian is a Certified Professional in Erosion and Sediment Control.

Our specialists are experienced professionals with in-depth knowledge of their application area. They function across all Nilex regions and can provide assistance in determining the best solution for the challenges you face at any stage of a project. Just another way of knowing you've made a smart choice.

Talk to Our Team

Want more information on our products and services? Need help with your order? Contact our team today.

With 38 years' experience in the geosynthetics industry and a long-standing commitment to the environment, our highly qualified staff can assess your needs and work with you to determine the best solution for the challenge you're facing.

Email

Call: 303.766.2000

Request a Quote

Back to Top